71 |
Agenda format for State Level Scheme Sanctioning Committee (SLSSC) (18.08.2020) |
27/08/2020 |
Download (1.17 MB) |
Jal Jeevan Mission |
72 |
Letter regarding ensuring registration or sign-up of NGOs or CSOs or NOs etc. in the NGO Darpan Portal of NITI Aayog(20.08.2020) |
20/08/2020 |
Download (710.37 KB) |
Swachh Bharat Mission |
73 |
Letter regarding capacity strengthening activities to be taken up by the state governments under SBM(G) Phase-II(18.08.2020) |
18/08/2020 |
Download (53.71 KB) |
Swachh Bharat Mission |
74 |
Letter regarding ensuring optimum and timely utilization of 15th Finance Commission tied grants of Rural Local Bodies for drinking water supply and sanitation services(10.08.2020) |
10/08/2020 |
Download (2.92 MB) |
Swachh Bharat Mission |
75 |
Letter regarding IMIS Module for declaration of Open Defecation Free (ODF) Plus villages(23.07.2020) |
23/07/2020 |
Download (1.59 MB) |
Swachh Bharat Mission |
76 |
Letter regarding implementation of PFMS under Swachh Bharat Mission (Grameen) Phase-II(21.07.2020) |
21/07/2020 |
Download (1.85 MB) |
Swachh Bharat Mission |
77 |
Letter regarding third party inspection agencies under Jal Jeevan Mission(13.07.2020) |
13/07/2020 |
Download (3.86 MB) |
Jal Jeevan Mission |
78 |
Letter regarding construction of Community Sanitary Complexes (CSCs) in villages in convergence with SBM(G) Phase-ll and MGNREGA(06.07.2020) |
06/07/2020 |
Download (420.56 KB) |
Swachh Bharat Mission |
79 |
Gazette Notification Amendment in MGNREGA - inclusion of CSC labour component(03.07.2020) |
03/07/2020 |
Download (1.36 MB) |
Swachh Bharat Mission |
80 |
Letter regarding implementation of JalJeevan Mission (JJM)- design and implementation of rural water supply schemes to last for the complete design period(23.06.2020) |
23/06/2020 |
Download (459.54 KB) |
Jal Jeevan Mission |